Pre-Trial Joint Acceptance

Published: 2026-07-22 | 14 views

Joint Acceptance Prior to Auxiliary Equipment Subsystem Trial Operation

     Conduct a joint inspection of all auxiliary equipment pipelines, tubes, and electrical wiring, including water pumps, fans, valves, and instruments, to confirm that all preconditions for single-unit trial operations are fully satisfied. Simultaneously verify equipment installation precision, pipeline tightness, and the on-off performance of electrical control systems to eliminate various trial operation risks in advance, such as incorrect pipeline connections, assembly deviations, and instrument failures.