Circulating Water Pump Installation
Circulating Water Pump Installation
Level and align boiler circulating water pumps after positioning, complete the pre-installation of equipment anchor bolts and pre-positioning for pipeline matching, and calibrate the coaxiality of the pump body and motor. Standardize base fixing and the layout of pipeline supports and hangers, fix the overall installation datum of the water circulation power units, and ensure flat assembly and precise alignment of the power equipment in the water circulation system without residual assembly stress.

