No-Load Single-Machine Trial Operation of Fans
2026-07-22
Inlet and Outlet Pipeline Connection for Fans
2026-07-22
Fan Installation Acceptance
2026-07-22
Hoisting and Positioning of Fan Main Bodies
2026-07-22
Secondary Grouting and Curing of Fan Anchor Bolts
2026-07-22
Air Preheater Equipment Acceptance
2026-07-22
Air Preheater Installation
2026-07-22
Air Preheater Equipment Hoisting
2026-07-22
Burner Installation
2026-07-22
Heating Surface System Hydrostatic Test
2026-07-22
Visual Acceptance of Boiler High-Pressure Pipeline Welds